GeoCivix System Enhancements Notification for Nov 13th, 2026

Posted 5 days ago by Coe Douglas

C
Coe Douglas Admin

Skip to main content

GeoCivix System Update Notification


Release Notes  Published November 12, 2026 by GeoCivix


GeoCivix System Update Notice 
Dear GeoCivix Administrators, 
We are pleased to announce several GeoCivix system enhancements in our latest release, including a modernized inspection report, an improved project email editor, consistent API and webhook date formatting, and a cleaner page header. This release also includes fixes for project access request emails, custom document table editing, and attachments with unusually long file names. 
Update Summary 
Date: Friday, November 13, 2026 What You Need to Do: Nothing Risk Level: Low 
Key Enhancements 
Modern Inspection Report Inspection reports can now be built in the custom document builder, and a ready-made modern report layout is available to every portal. Nothing changes until an administrator chooses it: every portal keeps its current inspection report.The setting is located in the Fees section of each workflow, directly below Offline Payment Instructions.
  • Three new elements are available in Portal Configuration > Custom Documents: Inspection Details (a letterhead with your portal logo, the result, the project, inspection and site contact details, custom inspection fields and inspector notes), Inspection Photos & Comments (the checklist results with the inspector's comments and photos, one to four photos per row) and Inspection Signatures.
  • Each custom document has a new Document Use setting: General Document, Inspection Report or Default Inspection Report. A portal can have one default.
  • Each inspection type has a new Inspection Report setting: Portal Default, Current report, or one of your inspection report documents, so a fire inspection can use a different report from a sewer inspection.
  • Every portal has a Modern Inspection Report document to start from. It is available but not used until you choose it.
  • The report you choose is used in the browser, for the saved PDF and for the PDF attached to notification emails.
 

WHAT YOU NEED TO DO

To use the modern report for one inspection type, open Inspections > Configuration > Inspection Types and choose the document under Inspection Report. To use it for every inspection type, set the document's Document Use to Default Inspection Report. Set either one back to return to your current report.



An inspection report using the Modern Inspection Report: the letterhead with the result, the project, inspection and site contact details, a summary of the checklist, and the results grouped by outcome. 




  The Modern Inspection Report document in Portal Configuration > Custom Documents, with the new Document Use setting and the three inspection elements. 



 

Updated Project Email Editor The editor for composing project emails has been updated. It keeps the same tools: font and size, text color, bold, italic and underline, numbered and bulleted lists, alignment, tables, links, images and the HTML source view.
  • Text color is picked from a palette of swatches.
  • You can paste a screenshot or an image file straight into the email.
  • A toolbar button you cannot use explains why when you point at it.

Composing a project email, with the text color palette open.
 

One Date Format in the API and Webhooks Every date in API responses and webhook messages now uses one format, ISO 8601 in UTC, for example 2025-05-13T16:04:51Z. Previously the format depended on the field, such as June, 12 2025 10:06:21 -0700 or 12/31/2025 12:00 PM.
  • The API version is now 1.3.0, and the examples in the API documentation show the new format.
  • Text fields that happen to contain a date are left exactly as entered.


WHAT YOU NEED TO DO

If you have an integration or script that reads dates from the GeoCivix API or webhooks, check that it accepts the new format.



Fewer Review Decision Confirmations Clicking Decline Review or Approve Review no longer asks you to confirm when the next step is another page, such as a form attached to the workflow. You go straight to that page. The confirmation still appears when the decision runs the workflow's actions right away.
  • Approve Review also goes straight to the next page when the project has unpaid fees to deal with first.

Long Attachment File Names Photos and files with very long names, attached to inspections and comments, now save normally. A name that is too long is shortened when the file is saved; the file itself is not changed. Project Access Request Email FixRequesters no longer receive repeated Accepted or Declined emails after asking for access to a project. The grant and decline links in the access request email now open a page where you confirm your choice, and nothing changes until you click the button on that page.
  • If the requester already has the access you grant, the page says Permission Already Approved and no second email is sent.
  • When access requests are turned off for a project, users without access now see a message saying so and asking them to contact the project administrator.

Page Header AlignmentThe Tasks and Messages icons and your account button in the page header are now evenly spaced and lined up, and the account menu opens aligned to the right edge of the page.
  • Project pages use the same header height as every other page.


The Tasks and Messages icons and the account button, evenly spaced and lined up in the page header.

 


Access Requests on Projects Without an Administrator An access request on a project that has no project administrator now goes to your portal's email address, so someone on your staff receives it. The confirmation the requester sees says where the request went.
  • A workflow with no access request recipient chosen sends requests to the project administrator, the same as most workflows.



WHAT YOU NEED TO DO

Requests for projects without a project administrator will arrive at your portal's email address. Assign a project administrator to a project to send its requests to that person instead.



Table Editing in Documents Right-clicking inside a table in the rich-text editor shows the table menu again, so you can insert or delete rows and columns, merge or split cells, and change cell and table properties. This covers documents such as permits that are filled in when they are issued. 

Right-clicking in a table: the Row options include inserting and deleting rows.
  

Infrastructure Changes These changes are to the platform behind the application rather than to the screens you use day to day. You should not notice a difference. If anything behaves unexpectedly after this release, please let our support team know so we can look into it right away. 

Document Processing Improvements were made to how documents are processed, including flattening markups and applying stamps. If a stamped, approved or marked-up document looks different from what you expect, let your support contact know. 



That’s all folks! 
We appreciate your understanding and cooperation as we make these improvements. Should you have any questions or require additional information, please feel free to contact us. 
For the fastest resolution and improved tracking, we encourage you to submit any questions or comments through our support ticketing system at support@geocivix.com 
Warm Regards, The GeoCivix Team 
You are being sent this message because you’re listed as an administrator with GeoCivix.com or idtPlans.com



Terms of Use  |  Privacy Policy  |  Accessibility
Copyright © 2026 GeoCivix, LLC. All Rights Reserved.

Civi






0 Votes


0 Comments

Login to post a comment